Bonneville Can Remove, Replace, or Repave Your Parking Lot, Road, or Drive Way

Situations where paving is required are as follows:

  1. There is a new asphalt construction for new or remodeled parking lots.
  1. Large areas are torn out of the new asphalt, and a paver is used rather than patching equipment.
  1. Usually a minimum of 2 inches are laid, but it is usually closer to 2.5 to 3 inches. Sometimes we’ll even do 4 inches for heavily trafficked areas.
before

Before

After

After

 

 

 

 

 

 

 

The knowledgeable professionals at Bonneville Asphalt can help you with any and all of your asphalt needs. Asphalt is a lot more forgiving than concrete. Properly applied, asphalt can last upwards of 20 to 30 years.

Paving can turn a dirt driveway or old and worn parking lot into a show piece. Compared to its counterpart (concrete), it is half the going rate and a lot more versatile.

state of utah image
Bonneville Asphalt 526 South 490 West, Orem, UT 84058 | 801-225-3544